School House Museum
Deep River, Ontario

Gallery Thumbnail Gallery Stories Contact Us Search
 

The "SWISHA" Project
Images:

 
Looking up at Camp #2 from the main dam level
91 of 106
Main Cafeteria at Camp #2
92 of 106
A group of hungry men waiting to have dinner at the main cafeteria at Camp #2
93 of 106
The inside of Camp #2 Cafeteria
94 of 106
Menu from Camp #2
95 of 106
A view of Camp #3 from the Quebec side of the river
96 of 106
The main Office at Camp #3
97 of 106
The main Wharehouse at Camp #3
98 of 106
The Building of the Colony
99 of 106
A group of men putting a sewer line in at the colony
100 of 106
The same street as shown in the last picture at the colony
101 of 106
McConnell Lake Control Dam construction
102 of 106
Des Joachims before After
103 of 106
100 Foot Fill, crossing the Mackey Creek Ravine for the rerouted of Hwy 17 and Railway
104 of 106
Log Chute during construction
105 of 106
DesJoachims Main Dam
106 of 106

Page: 1 2 3 4 5 6

Important Notices  
© 2024 All Rights Reserved