Drilling crew
19 of 317
Cribbing for the main conveyor belt to carry cement to the forms of the dam. Ontario side.
20 of 317
Divers working on cribbing on the first coffer dam
21 of 317
Building of the boiler house at camp #1.
22 of 317
The tailrace section
23 of 317
The "tailrace section" or outlet "flume frames (forms)" set in the concrete
24 of 317
Francis Turbine Runner
25 of 317
The inlet of the "scroll case" section of a flume
26 of 317
The completed flumes in place
27 of 317
Making tiers for the framework
28 of 317
The tailrace area viewed looking upstream towards the dam from the "Swisha" bridge
29 of 317
The starting of the steel works
30 of 317
The frame (form) work
31 of 317
As the steel work progressed towards the Quebec side, a section between two towers fell
32 of 317
Pouring of concrete
33 of 317
Cribbing for the base of the powerhouse
34 of 317
Work on the base of the main dam
35 of 317
Gantry Crane placing sluice gates
36 of 317