Winterton Boat Building Museum
Winterton, Newfoundland and Labrador

Gallery Thumbnail Gallery Stories Contact Us Search
 

Traditional Boat Building of Winterton
Images:

 
Installing battens on the hull of a 32 foot trap skiff at Reid's Mill.
145 of 249
Timbering out
146 of 249
Finding the shape for a timber
147 of 249
Selecting the correct timber piece
148 of 249
Checking the fit
149 of 249
Sawing a timber
150 of 249
Lock saw (keyhole saw)
151 of 249
Using a bench vise
152 of 249
A second timber is cut
153 of 249
Attaching timber pairs
154 of 249
Timbered out in the mid-ship section
155 of 249
Placing the forward timber
156 of 249
Timbering out
157 of 249
Timbered out
158 of 249
Removing the temporary frames
159 of 249
The risings are installed and the boat's alignment checked
160 of 249
Plumb bob
161 of 249
Installation of the thwarts
162 of 249

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Important Notices  
© 2024 All Rights Reserved