The "SWISHA" Project
Images:

 
Des Joachims Development General Arrangement
1 of 93
Ernie Walker with survey crew
2 of 93
Cribbing for the cofferdam on the north side of the dam. This is on the "Swisha" island.
3 of 93
The drilling crew drilling rock, for the base of the first cribbing.
4 of 93
The tailrace section
5 of 93
The "tailrace section" or outlet "flume frames (forms)" set in the concrete
6 of 93
Francis Turbine Runner
7 of 93
The inlet of the "scroll case" section of a flume
8 of 93
The completed flumes in place
9 of 93
Making tiers for the framework
10 of 93
The tailrace area viewed looking upstream towards the dam from the "Swisha" bridge
11 of 93
The starting of the steel works
12 of 93
The frame (form) work
13 of 93
As the steel work progressed towards the Quebec side, a section between two towers fell
14 of 93
Pouring of concrete
15 of 93
Cribbing for the base of the powerhouse
16 of 93
Work on the base of the main dam
17 of 93
Gantry Crane placing sluice gates
18 of 93