School House Museum
Deep River, Ontario

Gallery Thumbnail Gallery Stories Contact Us Search
 

The "SWISHA" Project

 
Drilling crew
19 of 318
Cribbing for the main conveyor belt to carry cement to the forms of the dam. Ontario side.
20 of 318
Divers working on cribbing on the first coffer dam
21 of 318
Building of the boiler house at camp #1.
22 of 318
The tailrace section
23 of 318
The "tailrace section" or outlet "flume frames (forms)" set in the concrete
24 of 318
Francis Turbine Runner
25 of 318
The inlet of the "scroll case" section of a flume
26 of 318
The completed flumes in place
27 of 318
Making tiers for the framework
28 of 318
The tailrace area viewed looking upstream towards the dam from the "Swisha" bridge
29 of 318
The starting of the steel works
30 of 318
The frame (form) work
31 of 318
As the steel work progressed towards the Quebec side, a section between two towers fell
32 of 318
Pouring of concrete
33 of 318
Cribbing for the base of the powerhouse
34 of 318
Work on the base of the main dam
35 of 318
Gantry Crane placing sluice gates
36 of 318

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Important Notices  
© 2024 All Rights Reserved